EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
N524JL/N87JL
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (206)
Research
- (2)
Workshop
- (7)
Empennage
- (51)
-
Rolled LE and FINISH
-
Attached trim tab
-
Trim tab assembly...
-
Closing up the left...
-
Left elevator riblet...
-
Right elevator complete
-
*****Right elevator...
-
Right elevator...
-
Bending the elevators
-
Elevator trim...
-
Elevator stiffeners
-
Rolling the rudder...
-
Trailing edge time
-
Rudder skins on
-
Rivet the rudder...
-
New TE wedge in
-
The TE...
-
Rudder counterweight
-
Getting ready for...
-
Rudder...
-
Beveled...
-
Rudder cont
-
Began the rudder...
-
Rudder stiffeners...
-
Beginning rudder
-
Vertical stabilizer...
-
Vert ribs
-
Vert spar
-
VERT CONT
-
Starting the...
-
Finished the...
-
Front spar and left...
-
No going...
-
Dirty hands…
-
New tool
-
Hole enlarged/response
-
Drill...
-
VA146 bearing
-
HS00005&HS00006
-
First look at a...
-
Flange tool
-
HS 714-710 bend&...
-
702 Cont
-
......702 notch...
-
Ok, so here it...
-
Transition to the...
-
Rear spar
-
Inventory time
-
It arrived!!
-
Official owner
-
EMPENNAGE ORDERED
Wings
- (57)
Fuselage
- (64)
-
HS fairing tap
-
Had to set the pedal...
-
Drilled roll bar to...
-
In case you didn't...
-
Aileron trim bracket
-
Vertical Stab attach
-
Elevator pushrod
-
HS drill and install.
-
Static port install
-
Back at...
-
Brake lines
-
Sub panel
-
Foreword deck mock-up
-
Gear weldments
-
Completed flap...
-
Flaps
-
Began covers in the...
-
Seats completed
-
Baggage bulkhead...
-
Braided teflon brake...
-
Tunnel cover pieces
-
Seat hinges
-
Side steps
-
Gussets and top skins
-
Seatbelt anchors
-
695 gussets complete
-
Began positioning...
-
F-757 Gusset and...
-
Riveted aft deck
-
Aft deck
-
FLIPPED THE CANOE
-
Finished fuselage...
-
3M Firewall sealant...
-
Began riveting side...
-
Beginning to rivet fuse
-
Completed fuselage...
-
Completed fabrication
-
Rudder pedals...
-
Upgraded rudder pedals
-
Tank attach bracket...
-
F684 gusset and...
-
Finish kit inventory...
-
Auxiliary and lower...
-
Build selfie ;)
-
Gear weldmant...
-
Straps
-
Fuselage work continued
-
Began fitting firewall
-
Finish kit arrived!
-
Bending conical bend...
-
Center section and aft
-
*PHONE AND BUILD...
-
706 bulkhead...
-
706 bulkhead
-
Rudder block
-
705 bulkhead rivet...
-
705 bulkhead
-
705 Bulkhead begin
-
Completed center...
-
Firewall complete
-
Began spar center...
-
Fuselage started!...
-
Annnddd the arduous...
-
Fuselage kit has...
Canopy
- (1)
Controls
Firewall Forewar
Engine/Cowling
- (2)
Fuel System
Propeller
- (1)
Instrument Panel
- (6)
Avionics
- (5)
Lighting
Landing Gear
Interior Finish
Paint / Decals
Inspection
Tools
- (7)
Practice
- (2)
Service B’s
- (1)
Builder Name:
Jeremy Leonard
-
Project:
Vans - RV-7A
-
VIEW REPORTS
Total Hours:
1074
Total Flight Time:
Start/Last Date:
Mar 17, 2021 - No Finish Date
Engine:
Lycoming IO360M1B
Propeller:
Sensenich 3 Blade Composite Ground Adjustable/Fixed pitch
Panel:
Garmin G3XTOUCH/GNX375/G5/GTR200/GFC507
Friendly URL:
https://eaabuilderslog.org?s=N524JL/N87JL
Home or Last Project Picture
Aug 17, 2021
Elevator stiffeners
- (6 hours)
Category: Empennage
Spent some time cutting, shaping, deburring all of the elevator stiffeners. Quite the task, but it went smoothly and was easy. I then fitted the stiffeners to the corresponding elevator and final drilled them.
8A93BBE4-C7AD-4382-B96E-839FDF1878B5.jpeg
1518BEBC-81C7-42C3-AA4D-E9BDBBAB37E8.jpeg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.